Project Name | Industrial and Commercial Bank of China Guizhou New Sub branch Hall | Project Introduction | 1. Two U-shaped strip screens on the front 2. One interactive ground screen. |
---|---|---|---|
Project Date | 2022.07 | Equipment used | KS9000、KS928*2、S4*12、G612F*238 |
Project Location | Ninghe District, Tianjin | Project Requirements | 1. Centralized control of one server. 2. Smooth playback without jamming, clear and smooth picture quality. 3.8k resolution point to point playback. |
View all cases
-
Arc slide opening and closing screen of Jiangxi Ji'an International Convention and Exhibition Center
Project Name:Arc slide opening and closing screen of Jiangxi Ji'an International Convention and Exhibition Center
Project Date:2022.07
Project Location:Jiangxi Province
Project Introduction:1. P2.5 module, whole screen 6016 * 1664 2. Five part screen, separable and separable, slide rail opening and closing screen
-
Yuanchuang International Building Exhibition Hall
Project Name:Yuanchuang International Building Exhibition Hall
Project Date:2021.07
Project Location:Nanchang City, Jiangxi Province
Project Introduction:Four sided immersion screen.
-
Tangshan Kailuan tourist area service desk
Project Name:Tangshan Kailuan tourist area service desk
Project Date:2021.04
Project Location:Tangshan City, Hebei Province
Project Introduction:1. A large screen at the front door with a resolution of 3840 * 2176 2 There are five square column screens in the inner hall, and the resolution of each column is 1536 * 832 3 There is a background screen behind the bar with a resolution of 2816 * 576 4
-
Anhui Lu'an iron and Steel Co., Ltd
Project Name:Anhui Lu'an iron and Steel Co., Ltd
Project Date:2020.11
Project Location:Anhui
Project Introduction:The wall screen can be divided or combined, and the picture quality is clear and smooth.
-
Heze Ski Resort
Project Name:Heze Ski Resort
Project Date:2020.09
Project Location:Heze City, Shandong Province
Project Introduction:Tunnel screen, module p3-2038s, tunnel screen is 5696x2816 long, and another half of the round screen is the top of the tunnel.
-
Round cake screen of exhibition hall of Kunming Planning Museum, Yunnan
Project Name:Round cake screen of exhibition hall of Kunming Planning Museum, Yunnan
Project Date:2021.03
Project Location:Yunnan
Project Introduction:There is a 3.5m diameter round cake screen and special-shaped plate in the exhibition hall.
-
Chongqing Chang'an immersive LED display
Project Name:Chongqing Chang'an immersive LED display
Project Date:2020.12
Project Location:Chongqing
Project Introduction:5 screens, front can be opened or closed
-
Chutian medicine exhibition hall
Project Name:Chutian medicine exhibition hall
Project Date:2021.11
Project Location:Ningxiang City, Hunan Province
Project Introduction:4K large screen
-
Beijing army aviation academy
Project Name:Beijing army aviation academy
Project Date:2020.01
Project Location:Beijing
Project Introduction:P3,4608×832