Project Name | Arc slide opening and closing screen of Jiangxi Ji'an International Convention and Exhibition Center | Project Introduction | 1. P2.5 module, whole screen 6016 * 1664 2. Five part screen, separable and separable, slide rail opening and closing screen |
---|---|---|---|
Project Date | 2022.07 | Equipment used | SV16、G612*94 |
Project Location | Jiangxi Province | Project Requirements | 1. One device and one computer control the whole large screen. 2. The picture quality is clear and smooth, without jamming. 3. Different signal screens can be switched. |
View all cases
-
Hebei Tangshan Qian'an Tangshan special steel
Project Name:Hebei Tangshan Qian'an Tangshan special steel
Project Date:2021.08
Project Location:Tangshan City, Hebei Province
Project Introduction:The large 4K curved screen in the exhibition hall of Qian'an Tangshan special steel enterprise uses ks9800 video processor. Ks9800 video processor supports kystar frame synchronization (KFS) technology, which can ensure the complete frame synchronization
-
Tianjin Ninghe Citizen Square Exhibition Hall
Project Name:Tianjin Ninghe Citizen Square Exhibition Hall
Project Date:2022.07
Project Location:Ninghe District, Tianjin
Project Introduction:1. Two U-shaped strip screens on the front 2. One interactive ground screen
-
Yuanchuang International Building Exhibition Hall
Project Name:Yuanchuang International Building Exhibition Hall
Project Date:2021.07
Project Location:Nanchang City, Jiangxi Province
Project Introduction:Four sided immersion screen.
-
Xi 'an national digital publishing house
Project Name:Xi 'an national digital publishing house
Project Date:2018.11
Project Location:Xi 'an
Project Introduction:The home screen2816*512
-
Beijing maker town
Project Name:Beijing maker town
Project Date:2022.04
Project Location:Beijing
Project Introduction:1. A large main screen on the front
-
Heze Ski Resort
Project Name:Heze Ski Resort
Project Date:2020.09
Project Location:Heze City, Shandong Province
Project Introduction:Tunnel screen, module p3-2038s, tunnel screen is 5696x2816 long, and another half of the round screen is the top of the tunnel.
-
Haier group international exhibition hall
Project Name:Haier group international exhibition hall
Project Date:2018.09
Project Location:Shandong
Project Introduction:Two servers have unified control over 20 screens to achieve complete point-to-point display. One plays 16 videos at the same time, while the other plays 9 videos at the same time.
-
Jilin University Town studio
Project Name:Jilin University Town studio
Project Date:2021.12
Project Location:Jilin City, Jilin Province
Project Introduction:Side screen 1280 × 2048 two, main screen 5440 × 2048, total resolution 8000 × 2048.
-
National phosphorus resources development and Utilization Engineering Technology Research Center
Project Name:National phosphorus resources development and Utilization Engineering Technology Research Center
Project Date:2021.03
Project Location:Yunnan
Project Introduction:1. A horn cylindrical screen in the exhibition hall of the research center